Been back three weeks now.
Hi All,
Thought I'd send another picture of the "hole". There are round-the-clock sewage pumping trucks on site....good thing cause our basement under the ministry center is rank. I taped off the door tonight to stop the flow of air into the building. They must have ruptured a main sewer line in the earth below our building. You can see they moved most everything away from the hole, layed in wire mesh and pelted it with concrete to stabilize the walls. I've been on our roof several times to get a visual on the situation. The renovation final touches are going on unabated in the aula and a friend, Roland, from Springfield has plumbed the bathrooms and is staying longer to finishing a ladies and mens bathroom upstairs near the new offices, and install heating pipes and radiators in the new rooms. Our other guest, Doyle was here for about 10 days and worked his magic on some electrical issues, and hammer drilling overhead through steel reinforced concrete floor to put in a sewer line for the upstairs bathrooms with Roland. He also had a hand in running a new phone line from the building next door, through the sewer-smelling labrinth of tunnels in the basement and up into our offices. Thanks Doyle!
1 Comments:
Hey Brad, thanks for introducing Doyle and Roland to us. It has been a blessing to me to see their servant hearts. Szép napot!
Post a Comment
<< Home